

A lot has happened since the previous photo. The other two walls were raised; one completely finished, the other only as a rough frame. Then the two heavy roof panels were hoisted above the structure and carefully positioned. The roof is covered with 18" cedar shingles that were stained. You can see the underlying shingle color where one has popped off (top left). The top two courses of shingles still need to be attached; a job which requires scaffolding and saftey ropes.
